top of page
HUB.png

Fifth-Third Bank Headquarters

Project Connect.

Nearly 50 years after Fifth Third Bank planted roots at Fountain Square, they decided to take on a complete transformation of their headquarters—also known as “Project Connect.” This three-year project, completed in collaboration with BHDP Architecture, was the capstone of a comprehensive overhaul of Fifth Third’s employee and visitor experience. Guided by an integrated team of architects, interior designers, and experiential graphic designers, this project prioritized design drivers around legibility, unity, and connection.

image-grid-with-carousel-Fifth-Third-Bank-Exterior-for-Video_0.jpg

Vine St. Window Vinyls

Screenshot 2023-05-22 at 3.14.17 PM.png
Screenshot 2023-05-22 at 3.14.08 PM.png
Walnut_Vinyl-17.png
3 headquarters-33.jpg
3 headquarters-32.jpg
3 headquarters-29.jpg

Vine St. Mural

Screen Shot 2020-03-11 at 11.47.16 AM.png
VineSt-Mural_200320-08.jpg
VineSt-Mural_200320-01.jpg
Asset 12.png

6th Street Connector

Sixth_Street_Wallcovering_A-01.png

TILE

HUB Mural

Forum Lenticular Wall

3 headquarters-25.jpg
3 headquarters-26.jpg
3 headquarters-23.jpg
bottom of page